How do I setup configurations for finished lenses?
Posted by on 03 Jun 2014 02:39 PM

Specify individual configurations (UPC, Sphere, Cylinder, Diameter, Base Curve, and Cost) for finished lens inventory items. This will allow for:

  • Management of in-house finished lens inventory
  • Provides status of stock lenses at the time of order so you do not have to leave the patient to check if the lens is in stock
  • Loss prevention of finished lens inventory
  • Set reorder points for stock lenses

To setup Finished Lens Configurations:

  1. Go to File > Inventory > Spectacle Lens
  2. Select the lens you would like to setup finished lens configurations
  3. Click the Modify button. The Add/Modify Spectacle Lens Inventory screenwill appear
  4. Check the Inventory check box. The Configurations tab will appear in between the Transactions and Treatments tabs
  5. Click on the Configurations tab
  6. Select the Location you wish to setup lens configurations
  7. Click the Add button to add a new lens configuration
  8. Enter the UPC, Sphere, Cylinder, Diameter, Base Curve, Cost for the lens
  9. Set the Reorder Point and Max Inventory amounts
  10. Verify these amounts.

 



Attachments 
 
 finishedlenses.jpg (107.58 KB)
(0 vote(s))
Helpful
Not helpful

Comments (0)
Post a new comment
 
 
Full Name:
Email:
Comments:
CAPTCHA Verification 
 
Please enter the text you see in the image into the textbox below (we use this to prevent automated submissions).

Copyright © 2015 Insight Software, LLC | My Vision Express